Sports Park - Baseball Facilities

Owner: Northeast Independent School District

Cost: $8,106,500

Square Footage: 1500 Seat Baseball Stadium

Completion Date: Fall 2018

Delivery Method: DOCC / Construction Manager at Risk

Company Office: San Antonio

Project Location: 12001 Wetmore Rd. San Antonio, TX 78247

Owner Contact: Gary Sullivan 210-407-0438

Architect: PBK - James Moore - 210 - 829-0123; 601 NW Loop 410 Suite 400, San Antonio, TX 78216

This state of the art facility will house
a 1500 seat intimate radius stadium structure that envelopes the new synthetic
turf baseball field with a large and contiguous structural steel covered canopy
and brick façade that interfaces with the existing pressbox and
restroom facilities.  During design, our
firm worked hand in hand with the architect to balance the site due to a
thirteen foot elevation drop in the existing topography from the existing pressbox to
the new outfield fence and batter’s eye. 
Retaining walls are constructed along with underground high capacity
storm sewer drainage culverts to create a balanced site for a concentric
sub-field drainage system with liner and perimeter dam walls for constant
moisture stabilization under the field. 
The new stadium seating area will be constructed with a slab on grade
concrete structure with high end stadium chairs, backstop netting,
aesthetically attractive architectural design and new sports lighting for elite
sporting event play for the community. 
This project will be a show piece for Marksmen GC and the San Antonio
region.

-MORE PROJECTS-

10609 IH-10 West, Suite 200
San Antonio, TX 78230

- CONTACT US -

HOW CAN MARKSMEN GENERAL CONTRACTORS SERVE YOUR CONSTRUCTION NEEDS?
Thank you! We look forward to working with you!
Oops! Please make sure you filled out each section of the form.