Southwest High School Renovations Phase 1

SouthwestISDSouthwestHighSchoolRenovations

Owner: Southwest Independent School District

Cost: $2,821,000

Square Footage: 40,000

Completion Date: August 2017

Delivery Method: CSP

Architect: Pfluger Architects

Project Description:  The scope of this CSP project included three separate projects. The first were ADA upgrades to the locker rooms of the main gym area to include building of three new ADA shower stalls and upgrades to locker laundry room. Secondly the addition of new bullet resistant security lobby including all new electrified hardware and a renovated administrative lobby and creation of a new attendance office. The major portion of this work was the renovation of the Career and Technology Building. This two‐story structure renovation included removal of mechanical systems in the entire building and replacement of approximately 44 variable air volume and fan power boxes and installation of 4 new roof top air handling units all requiring existing structural modification.  Lay in ceilings and lighting were replaced in the entire building. Additionally, a new Cosmetology Lab was created that included a fully operational hair salon, manicure and pedicure stations and make‐up stations. All the above scopes were completed in a 3‐month window during summer recess. 

-MORE PROJECTS-

10609 IH-10 West, Suite 200
San Antonio, TX 78230

- CONTACT US -

HOW CAN MARKSMEN GENERAL CONTRACTORS SERVE YOUR CONSTRUCTION NEEDS?
Thank you! We look forward to working with you!
Oops! Please make sure you filled out each section of the form.